Call Us on +1 877 417 6336

Speedy Solution For This Satisfied Customer

Published On : 2017-07-26

Time was short and space was limited for the contractors hired to erect a 4-story distillery tower in downtown Toronto. The tower, used to purify spirits at the Spirit Of York Distillery, required access ladders and service platforms to be able to service the two large copper filters from the inside.

This is when Skyline Group was contacted to provide a quick and viable solution for service men to have safe access to the top of the tower. A KATT access ladder, with tie off was designed to fit on the inside of the tower, with Pace 600 Walkway installed at each level, for maintenance to use as service platforms. As the parts for these products were already stocked, Skyline Group were able to custom manufacture and deliver within the requested time.

See the customers comments on the project in the video below:

 Speedy Solution For This Satisfied Customer

Have A Job On Hand And Need A Quote?

Speedy Solution For This Satisfied Customer

Want Us To Provide A Custom Solution?

Speedy Solution For This Satisfied Customer

SIGN UP NOW for news, product arrivals & deals